|
|
|
| Stability Module |
| Stability and
Shelf-Life Analyses |
|
|
|
 |
The following are features and benefits of Sapphire™ that address the specific needs of stability and shelf life testing:
 |
Support for a variety of conditions within a protocol,
including freeze/thaw. |
 |
Storage management that permits definition of the
physical storage system (chambers) and
environment, and easily shows free vs. occupied
locations. |
 |
Inventory management that, at any point during a
study’s lifecycle inventory, shows current and
required inventory, as well as flags when required
inventory is less than current inventory. |
 |
Study management, including automation of study
creation and start date, and special calendar
provisions for recurring events or holiday exclusions. |
 |
Work Order Management that tracks the status of
tasks assigned to individuals. |
| Setting Up a Protocol or Study |
Specifically, Sapphire accounts for the following requirements in a stability protocol:
 |
The nature and intended use of the product |
 |
Package/component material description and source |
 |
Method of manufacture/sterilization |
 |
Description of the type, size, and number of batches |
 |
Placement and orientation of unit storage |
 |
Storage conditions/parameters |
 |
Time-points where analysis will be performed (e.g. baseline, 3 months, 6 months, etc). |
 |
The number of duplicate samples to be created |
 |
Analysis specific to the attributes and uses of the product, including package integrity, pH, sterility, toxicity, weight loss, and chemical content/potency |
 |
Acceptance criteria |
The
Sapphire Stability Module:
 |
Enables automatic, configurable assignment of studies |
 |
Captures study justification |
 |
Tracks study status that automatically changes with the conclusion of the study. Statuses include Running, Suspended, Completed, or Cancelled |
 |
Can flag studies that have been modified by addition/subtraction of time points and/or conditions. |
 |
Allows the quantity of samples per sample pull to be entered so that the tests may be completed. |
 |
Allows the actual quantity received for the study to be specified |
 |
Provides the ability to adjust the quantity by whole percentages that would increase the required quantity to account for the possibility of retesting during the study |
 |
Provides a theoretical "available quantity" that is determined by subtracting the quantity required for testing from the actual total quantity submitted |
 |
Tracks the quantity put in each chamber location for a study |
In particular, Sapphire
provides the ability to:
 |
Schedule automatic sample logins based on the protocol’s selected time points |
 |
Track a sample once it is logged and the time it takes to complete testing |
 |
Notify designated person(s) if the time to complete testing is greater than the predetermined testing period. |
 |
Reconcile holiday "pull" decisions |
The Sapphire Stability Module enables organization to:
 |
Identify batches, sub-batch by lot #, location and date |
 |
Provide full traceability on finished goods to sub-lot level |
 |
Ensure FDA 21 CFR Part 11 electronic signature compliance, with audit history |
 |
Access the solution remotely (virtual user) via a browser - no Citrix required |
 |
Create multi-tiered and nested specifications |
 |
Integrate barcode labeling |
 |
Seamlessly integrate robust reporting |
 |
Create ad-hoc samples with and without formal requests |
 |
Highlight early warnings and real-time non-conformance |
 |
Monitor quality incidents |
 |
Enter different styles of results, including single sample and multi-sample |
 |
Review/edit samples at login including: actual collection date versus scheduled, test parameters, due date, priority, etc. |
 |
Check against multiple sets of specifications |
 |
Check against process/regulatory limits |
|
|
 |
 |
|
 |